Power Intelligence Articles & Reports
FERC, EPA, NERC, and market intelligence for data center power buyers. Articles, pricing guides, and equipment dossiers from SecondWatt analysts. Every claim cites a verifiable public source; editorial review is mandatory before publication.
Data center market and power research
Browse the data center intelligence hub for linked market research and operator context. Review the Northern Virginia market, London market and Equinix power profile, or use the Shadow Grid tracker to examine dated project disclosures.
Check the reporting period and source before comparing observations. Read the research methodology.
Equipment Intelligence
Technical deep-dives on generators, gas turbines, fuel cells, transformers, and switchgear. Specs, total-cost-of-ownership models, and procurement playbooks.
Market Analysis
Power market trends, pricing indices, and procurement strategy for data center developers. Coverage of PJM, ERCOT, MISO, CAISO, and emerging behind-the-meter structures.
Regulatory Updates
FERC, EPA, and NERC compliance developments affecting data center power procurement, interconnection queues, and emissions requirements.
Featured Sections
- Data Center Intelligence — operator and facility coverage
- Equipment Marketplace — verified inventory and pricing
- Financing — partner directory and capital intelligence
All Articles (94)
- AI Infrastructure Planning: Power Access, Grid Behavior and Equipment Readiness
- Ore Energy’s 1 GWh Iron-Air Storage Agreement: What Data Center Buyers Should Know
- OpenAI Data Centers in India: What the Tata Partnership Means for Equipment Buyers
- AI Data Center Capex in 2026: Separate Spending from Deployable Power
- Automatic Transfer Switch Sizing Guide | SecondWatt
- Gas Turbine OEM Backlogs in 2026: What Buyers Can—and Cannot—Infer
- Power Procurement Under Changing Rules: A Decision Framework
- Power Generation Facility Rules: FERC and EPA in 2026
- AI Grid Management: 11 Regulatory Actions, Zero Binding Rules for Buyers
- Data Center Ratepayer Protections: What's Actually Enforceable in 2026
- FERC Opens Six Show-Cause Dockets: What 2026 Data Center Power Rules Mean for Buyers
- Power Generation Facility Rules in 2026: What FERC and EPA Changes Mean for Buyers
- AI Data Center Solutions: A Power, Cooling and Procurement Plan for 2026
- DOE's $1.9 billion SPARK selections: what 23 GW of transmission capacity means for data center power
- 1.5 MW Diesel Generator: 1,500 kW Standby Specs and $602K-$713K Pricing
- Cummins' $450M Generator Expansion: The Big Gas Engines Don't Ship Until 2028
- Used 10 MW Generator for Data Centers: Why 5 × 2 MW Beats One Machine
- LM2500 Project Timeline: From Equipment Availability To Operating Power
- GE LM2500 Price: Used Turbine Packages, Scope And Buying Costs
- Buying A Used LM2500: Inspection, Documents And Package-Scope Checklist
- TM2500 vs LM2500XPRESS: Comparing Mobile And Modular Gas Turbine Packages
- Gas Turbine RFQ Checklist: How To Request Comparable Equipment Offers
- Gas Turbine Derating: How Site Conditions Change Available Power
- GE Frame 5 vs Frame 6: What Used Gas Turbine Buyers Should Compare
- Solar Titan 130 vs Titan 250: Which Gas Turbine Package Fits Your Project?
- How To Sell A Used Gas Turbine: Documentation, Valuation And Buyer Qualification
- Aeroderivative vs Industrial Gas Turbines: Choosing The Right Equipment Class
- Gas Turbine Operating Cost: Calculating Fuel Cost Per MWh
- LM6000 Variants Explained: What Buyers Must Verify Before Comparing Offers
- Gas Turbines For A 100 MW Data Center: Sizing, Redundancy And Equipment Selection
- BUYING A USED DATA CENTER UPS: BATTERIES, BYPASS AND ACCEPTANCE TESTING
- BATTERY ENERGY STORAGE FOR DATA CENTERS: BUYING THE REQUIRED MW AND MWH
- BUYING FUEL CELLS FOR DATA CENTERS: OUTPUT, FUEL AND SERVICE COMMITMENTS
- ATS VS STS FOR DATA CENTERS: BUYING THE RIGHT TRANSFER SWITCH
- BUYING USED CHILLERS FOR GPU DATA CENTERS: CAPACITY, CONDITION AND HEAT REJECTION
- INFINIBAND VS ETHERNET FOR GPU CLUSTERS: BUYING THE COMPLETE NETWORK
- Mobile Gas Turbines For Data Centers: Buying Bridge Power With A Defined Exit
- USED 2 MW STANDBY GENERATORS: A BUYER'S CHECKLIST
- LIQUID COOLING FOR GPU RACKS: HOW TO SELECT A CDU
- SGT-800 RATINGS AND UPGRADES: WHAT USED BUYERS MUST VERIFY
- LM6000 SPRINT: OUTPUT, WATER REQUIREMENTS AND BUYING CHECKS
- LM2500 Explained: Specifications, Variants And Generator Package Scope
- GB200 VS GB300 NVL72: WHAT TO VERIFY BEFORE BUYING A RACK
- GAS TURBINES VS RECIPROCATING GAS ENGINES FOR DATA CENTER POWER
- USED MEDIUM-VOLTAGE SWITCHGEAR: HOW TO SPECIFY A COMPLETE LINEUP
- H200 VS B200 VS B300: WHICH GPU SERVER SHOULD YOU BUY?
- USED PAD-MOUNT TRANSFORMERS: A BUYER'S COMPATIBILITY CHECKLIST
- LM2500 VS LM6000 VS SGT-800: A Buyer's Comparison
- BUYING USED H100 AND H200 GPU SERVERS: CONFIGURATION, TESTING AND WARRANTY
- USED GAS TURBINE COST: COMPARING PACKAGE PRICES AND INSTALLED SCOPE
- Gas Turbine Part-Load Performance: Sizing For Phased Demand
- Gas Turbine Black Start: Auxiliary Power And Load Acceptance
- Relocating A Used Gas Turbine: Scope, Transport And Commissioning
- Buying A Used Gas Turbine: Remaining Life, Overhaul Position, And Service Records
- Simple-cycle vs Combined-cycle Gas Turbines: Compare The Complete Plant
- Buying a Gas Turbine For a 50 Hz or 60 Hz Power System
- Gas Turbine Fuel Requirements: Secure The Supply Before Buying
- Gas Turbine Emissions and Permitting: Can You Build It At Your Data Center?
- Gas Turbine Water Consumption: What to Verify Before Buying
- 7 CFR Parts, No Final Rule: NRC's Nuclear Fuel Licensing Rewrite Decoded
- $1,398/kW: EPA Tier 4 Final Cost Pressure Is Driving Hybrid Generator Adoption
- Data Center UPS and Energy Storage: Topologies, Sizing, and Selection
- How to Size a UPS: kVA, kW, Power Factor and Redundancy
- UPS Energy Storage: VRLA, Lithium-Ion and Flywheel Compared
- Modular vs Monolithic UPS: Choosing a Frame Architecture
- UPS Topologies Explained: Double Conversion, Line-Interactive and Eco Mode
- 5 Rulebooks, One Continent: Europe Data Center Markets Split by Regulatory Stage
- GE Vernova Backlog Hits $176.3B: What 116 GW of Turbine Orders Means for Buyers
- Power Grid Infrastructure: DOE's $1.9B Move Meets an 18%-of-Target Build Rate
- Gas Turbine Orders Hit 100.3 GW in 2025: 7-Year Waits and What Buyers Do Now
- Natural Gas Power Plant Conversion: Costs and EIA Benchmarks
- Fuel Cells for Data Centers: Time-to-Power Math, $/kW Benchmarks, and the SOFC vs. Gas Turbine Decision
- Switchgear Maintenance Best Practices: A Field Guide for Power Teams
- 6 RTOs, 60 Days: The Data Center Interconnection Standards Rewrite Buyers Must Price
- $57.1M in One Outage Case: AI Grid Management Under FERC Order 1920 and SPP ER26-2592
- FERC's Large-Load Rulemaking Puts AI Data Center Demand on a New Regulatory Clock
- Switchgear Pricing 2026: PPI Up 14%, 15 kV Metalclad $549,800-$779,029
- Pad Mount Transformer: Types, Sizing and Cost
- Dry-Type and Cast Coil Transformers: Selection, Sizing, and Where Each Belongs
- Data Center Transformers: The Complete Selection and Procurement Guide
- Diesel Generators for Data Centers: Procurement and Buying Checks
- Project Glasswing: What Power Companies and Grid Operators Need to Know About AI Cyber Risk and FERC CIP Rules
- Wet Compression for Gas Turbines: Fast Brownfield MW Under FERC and EPA Constraints
- Data Center Generator Costs: Capacity, Scope and Delivery
- DOE Names First 4 Nuclear Energy Launch Pad Developers: What Power Buyers Need to Know
- Data Center Backup Power in 2026: 42-Week Lead Times, $1M Outages, and the Diesel-to-Hybrid Pivot
- Data Center Transformer Sizing Guide: Load Math, K-Factor, and Lead-Time Reality
- Data Center Generators: 55 GW Installed and What 2026 Buyers Face
- Ceres Power Achieves Record SOFC Efficiency: 92.55% CHP Performance Sets New Industry Benchmark
- Data Center UPS Pricing Guide: $/kW Ranges, Lead Times, and TCO Math for 2026 Buyers
- FERC's June 2026 Deadline on RM26-4-000: What Large-Load Buyers Must Watch
- Large Load Interconnection: What FERC RM26-4 Changes for Data Center Power Procurement Before June 2026
- Fusion Energy's $50/MWh Target: NRC Rulemaking, Capital Math, and What Buyers Should Watch
- Breaking the Data Center Power Bottleneck: A Procurement and Interconnection Roadmap