Sources and Citations

Our editorial standard is to link factual claims to the supporting source and preserve its date, scope and qualifications. Prefer the original manufacturer document, operator or utility disclosure, regulator, filing or market report appropriate to the claim. Record evidence gaps and omit unsupported values. A source review is not a guarantee that every published statement is correct.

Secondary sources include peer-reviewed journals, national lab publications (NREL, LBNL, ORNL), and analyst reports with disclosed methodology. Anonymous sources and vendor-sponsored whitepapers are not eligible as primary citations. Citations render as inline prose links; a claim without a source link blocks publication.

Pricing Methodology

Record the evidence type, equipment identity, condition, date, currency and included scope for each pricing observation. Keep asking prices, quotations and completed transactions separate. Publish a range only when the supporting population and calculation are documented; otherwise identify the observation as a single record or withhold the estimate.

A review date records when a source was inspected; it does not make a historical price current. Check the observation date and supporting records before using a price in a project budget. Seller identities, exact locations, and re-identifying condition filters are never published. Live tables sit in the Pricing Index.

Equipment Research

Cite the applicable manufacturer document for published model specifications. Unit-specific condition, test and certification statements require the relevant records for the actual equipment. Record unresolved fields explicitly and omit unsupported values. A standards reference or a successful URL check does not prove that a particular unit was tested, certified or suitable for the receiving site. Request the actual equipment records and have the responsible project team determine the required acceptance evidence. Only official manufacturer photography is used; AI-generated imagery of specific products is not permitted. See gas turbines, generators, and switchgear.

Modeling and Market Data

Technology comparisons in the Power Intelligence Tool score five generation options against identical inputs, discount cash flows at a stated cost of capital, price equipment lead time explicitly, and compute fleet availability from unit count and forced-outage rate rather than vendor claims. Data center market and operator coverage is documented in the DC Library, and published analysis lives in articles and reports.

Data center market and project evidence

Our publication policy requires market observations to be recorded separately from facility and project records. Each published observation must state its definition, unit, geographic or commercial scope, reporting period, publisher and source location. Historical observations must retain their dates when a later report is added.

Keep reporting-date snapshots, such as inventory and vacancy, separate from period activity, such as take-up and net absorption. Preserve the source’s definitions. A project’s announced design capacity, planned generation and operating capacity must retain their own labels. These different measures must not be combined into a single capacity total.

A source-check date records when the cited document was reviewed. It does not establish that a project is still in the same stage. Forecasts, roadmaps and vendor statements must remain attributed to their publishers. A forecast date passing does not change a project to operational.

Facility ratings, floor areas, commissioning dates, operator identities and power arrangements require evidence specific to the field. Where the evidence is incomplete, omit the field. Do not use a campus name, operator relationship or market assignment to fill an unknown rating.

Label SecondWatt procurement analysis separately from reported market observations. This analysis identifies questions and interpretations for further investigation. Establish site requirements and the offered equipment configuration for the actual sourcing inquiry.

SecondWatt holds no inventory. Buyers submit requests against equipment dossiers; sourcing partners register availability privately; introductions are anonymised. Public research must exclude seller identities, SecondWatt sourcing partners, private equipment stock quantities and internal pricing. A reference to an operator or project does not imply that its equipment is for sale.