GE Frame 7EA / 7E.03 Gas Turbines

GE Frame 7EA — gas turbine, 90 MW
GE Frame 7EA

60 Hz E-class heavy-duty gas turbine: 90 MW at 33.8% for GE Vernova's 7E.03, 91 MW for Baker Hughes' Frame 7/1EA, 4 ppm DLN1+.

This model is part of SecondWatt’s gas turbine research catalogue. Specifications and price observations are included where supported by sources. Equipment availability and commercial terms require confirmation.

GE Frame 7EA gas turbine: GE Vernova 7E.03 at 90 MW and 33.8%, Baker Hughes Frame 7/1EA at 91 MW and 4 ppm NOx, combined-cycle ratings and inspections.

The Frame 7EA (MS7001EA) is GE's 60 Hz E-class heavy-duty gas turbine, a single-shaft machine driving its generator directly at 3,600 rpm with no load gearbox. Two companies build it today. GE Vernova sells the 7E.03, rated 90 MW net at 33.8% LHV (10,107 Btu/kWh) in simple cycle, 140 MW at 52.4% in 1x1 combined cycle and 283 MW at 52.9% in 2x1, at ISO conditions on natural gas. Baker Hughes builds the Frame 7/1EA, rated 91 MW at 33.9% with 4 ppm NOx on its DLN1+ combustion system.

Per Baker Hughes, the machine has a 17-stage axial compressor at a 13:1 pressure ratio, ten reverse-flow combustion chambers offered with standard, DLN1+ or DLN1+ ultra-low-NOx systems, and three turbine stages with air-cooled first- and second-stage nozzles and buckets. It burns natural gas, LNG, distillate, treated residual and crude oil; GE Vernova cites tri-fuel capability with fuel switching while running and up to 100% hydrogen capability.

Baker Hughes cites its 7/1EA in LNG mechanical drive at Yamal LNG at -50 C and in a Saudi power plant on crude oil, and states nearly 1,000 units worldwide on its 7/1EA page. The 7EA is a smaller class than GE's 7F and 7HA frames and is distinct from the 50 Hz 9E.

Why it matters

The 7EA is a 90 MW-class 60 Hz frame with direct drive, single-digit NOx on DLN1+, wide fuel capability including crude oil, and two current manufacturers plus a large installed base. Assessment: its 33.8-33.9% simple-cycle efficiency trails aeroderivatives and newer frames, so its case rests on availability, fuel flexibility, combined-cycle use and the depth of its service market.

Who buys it

Utilities and independent power producers running 60 Hz peaking, intermediate and combined-cycle plants, industrial and petrochemical sites using it for combined heat and power, LNG developers using the Baker Hughes 7/1EA as a compressor driver, and buyers of used E-class units for relocation or spares.

Role in the data center

Assessment: a 90 MW block for large campuses, usually in combined cycle where 140 MW 1x1 or 283 MW 2x1 blocks reach about 52-53% per GE Vernova; two to three simple-cycle units cover a 150-300 MW phase with limited N+1 granularity. GE Vernova cites a 35-minute hot start for its 7E.03 combined-cycle plants.

Key specifications

Simple-cycle net output, 7E.03 (GE Vernova)90 MW
Simple-cycle net heat rate, 7E.03, LHV (GE Vernova)10,107 / 10,664 Btu/kWh / kJ/kWh
Simple-cycle net efficiency, 7E.03, LHV (GE Vernova)33.8 %
1x1 combined-cycle net output / efficiency, 7E.03 (GE Vernova)140 / 52.4 MW / %
1x1 combined-cycle turndown / ramp / hot start (GE Vernova)45 / 40 / 35 % minimum load / MW/min / minutes
2x1 combined-cycle net output / efficiency, 7E.03 (GE Vernova)283 / 52.9 MW / %
2x1 combined-cycle turndown / ramp / hot start (GE Vernova)22 / 80 / 35 % minimum load / MW/min / minutes
Hydrogen capability, 7E (GE Vernova)up to 100 %
Output, Frame 7/1EA, DLN, ISO (Baker Hughes)91 MW
Efficiency, Frame 7/1EA (Baker Hughes)33.9 %
NOx, DLN1+ (Baker Hughes)4 ppm
Exhaust temperature (Baker Hughes)552 C
Shaft speed, direct drive3600 rpm
Compressor stages / pressure ratio (Baker Hughes)17 / 13:1 stages / ratio
Turbine stages; air-cooled first and second stage (Baker Hughes)3 stages
Combustion chambers, reverse flow; STD, DLN1+ or DLN1+ ULN (Baker Hughes)10 chambers
Hot-gas-path inspection (Baker Hughes)32000 hours
Major inspection (Baker Hughes)64000 hours
Mean time between maintenance (Baker Hughes)32000 factored fired hours
Gas-turbine skid, L x W x H / weight (Baker Hughes)11.6 x 3.6 x 4.4 m / 134,000 kg m / kg
Auxiliary skid, L x W x H / weight (Baker Hughes)8.4 x 3.6 x 3.6 m / 38,000 kg m / kg
Units worldwide (Baker Hughes Frame 7/1EA page)nearly 1,000 units

Technical summary

GE Vernova rates the 7E.03 at 90 MW net, 10,107 Btu/kWh (10,664 kJ/kWh) and 33.8% LHV in simple cycle, net plant at ISO on natural gas; 140 MW and 52.4% in 1x1 combined cycle with a 40 MW/min ramp, 45% minimum load and a 35-minute hot start; and 283 MW and 52.9% in 2x1. Baker Hughes rates the Frame 7/1EA at 91 MW and 33.9% with 4 ppm NOx, 552 C exhaust and 3,600 rpm direct drive; the 17-stage compressor runs at a 13:1 pressure ratio and the turbine has three stages. Baker Hughes gives hot-gas-path and major inspections at 32,000 and 64,000 hours and a gas-turbine skid of 11.6 x 3.6 x 4.4 m and 134,000 kg.

Major variations

Current production comes as the GE Vernova 7E.03 (90 MW net) and the Baker Hughes Frame 7/1EA (91 MW). Combustion options in Baker Hughes' listing are standard, DLN1+ and DLN1+ ultra-low-NOx. The installed fleet includes older 7EA units with earlier combustors and controls, some of them upgraded since installation; the nameplate, combustor designation and upgrade history identify an offered unit. The 7EA is distinct from GE's 7F (7F.04, 7F.05) and 7HA classes and from the 50 Hz Frame 9E.

Configurations and options

Plants are built in simple cycle, 1x1 or 2x1 combined cycle, or as combined heat and power. Options that change price or lead time are the combustion system (standard, DLN1+ or ultra-low-NOx), single, dual or tri-fuel systems, the hydrogen fuel case, and for mechanical drive the compressor and helper-motor skid. Baker Hughes' typical package is a gas-turbine skid, an auxiliary skid and a driven-equipment skid.

Compatibility and dependencies

Direct drive at 3,600 rpm means the 7EA serves 60 Hz grids without a gearbox. Fuel systems must match the intended gas, distillate, residual or crude-oil supply. The gas-turbine skid weighs 134,000 kg, which sets crane and transport requirements, and combined-cycle plants need a heat recovery steam generator and steam turbine. A used unit's controls and combustor generation determine emissions and upgrade scope.

Planning price band

Modelled planning estimate: $0.15M–$0.66M/MW · $150–$660/kW · $13.5M–$59.4M per unit (7E.03 (simple cycle), 90 MW; Used or refurbished, serviceable; very low confidence; gt-planning-v3, as of 2026-11-03). Not a quote or an observed sale price. Gas turbine generator-set package. Included auxiliaries, controls, emissions equipment (SCR), warranty and delivery terms vary by unit and are subject to confirmation. Not a project budget: BOP, installation and financing sit outside this band.

Mature E-class frame with a large used fleet; frame and age discount.

What drives the price

New versus used; manufacturer and model (7E.03, 7/1EA or older 7EA); combustor generation and emissions capability; fuel systems; fired hours, starts and rotor life consumed; controls generation; simple-cycle or combined-cycle scope; dismantling, transport and installation scope.

Lifecycle and maintenance

Baker Hughes rates its Frame 7/1EA at 32,000 hours to hot-gas-path inspection and 64,000 hours to major inspection, with a mean time between maintenance of 32,000 factored fired hours. GE Vernova's 7E fact sheet does not state inspection intervals as of October 2026. A large 7EA installed base supports OEM and independent repair and parts supply.

Thermal and emissions profile

Baker Hughes rates its Frame 7/1EA at 4 ppm NOx with the DLN1+ system and describes single-digit NOx capability; standard combustors on older units emit more and may use water or steam injection. GE Vernova cites up to 100% hydrogen capability for the 7E, and Baker Hughes up to 100% hydrogen with the standard combustor.

Common failure points

7E.03, Frame 7/1EA and older 7EA units

Combined cycle and flexibility

Emissions and permits

Compare offers on

Seller checklist

What sets the value

Value rests on records: nameplates and serial numbers, fired hours and starts, combustion, hot-gas-path and major inspection reports, rotor life records, combustor and fuel-system configuration with emissions tests, generator tests, and controls upgrade history.

How much power does a Frame 7EA produce?

GE Vernova rates its current 7E.03 at 90 MW net in simple cycle at ISO conditions, and Baker Hughes rates its Frame 7/1EA at 91 MW. GE Vernova rates 1x1 combined cycle at 140 MW and 2x1 at 283 MW.

Can a 7EA run on hydrogen or liquid fuel?

GE Vernova cites up to 100% hydrogen capability and tri-fuel capability with fuel switching while running for the 7E. Baker Hughes lists natural gas, LNG, distillate, treated residual and crude oil, and up to 100% hydrogen with the standard combustor.

What are the 7EA inspection intervals?

Baker Hughes rates its Frame 7/1EA at 32,000 hours to hot-gas-path inspection and 64,000 hours to major inspection, with a mean time between maintenance of 32,000 factored fired hours.

Is a 7EA the same as a 7F?

No. The 7EA is an E-class machine of about 90 MW; GE Vernova's 7F.05 is rated 239 MW net in simple cycle at 60 Hz.

Inspection checklist

Confirm the model (MS7001EA, 7E.03 or Frame 7/1EA), serial numbers, build year and manufacturer from the nameplates. Obtain fired hours, fired starts and trip history. Review combustion, hot-gas-path and major inspection reports and rotor life records. Identify the combustor (standard, DLN1, DLN1+ or ultra-low-NOx) and fuel systems. Check generator tests, vibration trends, controls platform and upgrade history. Agree acceptance criteria before payment.

Procurement channels

New units come from GE Vernova (7E.03) and Baker Hughes (Frame 7/1EA, cited for LNG and power projects). Assessment: used 7EA units trade on the secondary market as utilities retire or repower plants, through equipment dealers, brokers and auctions; confirm the manufacturer, combustor and upgrade history of any offered unit.

Regional notes

The 7EA is a 60 Hz machine in direct drive; the 50 Hz counterpart is the Frame 9E. Baker Hughes cites operation down to -50 C at Yamal LNG. In the United States new units fall in the large band (above 850 MMBtu/h) of NSPS Subpart KKKKa (about 910 MMBtu/h LHV for the 7E.03, calculated), and older units remain under Subpart GG or KKKK by construction date.