Digital Realty Data Center and Power Profile

Digital Realty’s company disclosures can help frame a data-center power inquiry, but the equipment decision still belongs to a specific facility and delivery scope. This profile separates dated portfolio reporting from the documents a buyer or equipment owner needs for a transaction.

Reported energy performance: 2025

Digital Realty identifies its listing as NYSE: DLR in its May 27, 2026 announcement. That announcement reports the following results for 2025.

Company-reported measure Result Reporting period and boundary
Global renewable energy coverage 93% 2025; company-reported global coverage
Global power usage effectiveness (PUE) 1.38 2025; reported global result

Source: Digital Realty’s 2025 Impact Report announcement. These are historical company disclosures. Neither value is a guarantee for an individual building or a measurement taken today.

Translate portfolio reporting into site questions

SecondWatt procurement analysis. Ask the operator to identify the site, reporting boundary and applicable operating conditions before using a portfolio figure in a project model. For an energy requirement, request the facility-specific supply arrangement and the documentation supporting any environmental claim. Do not treat a renewable-energy percentage as proof of uninterrupted on-site generation or electrical independence from the grid.

For an efficiency requirement, ask whether the figure supplied is a design objective, an operating result or a contractual commitment. Keep its measurement period and load conditions in the comparison. A portfolio average should not silently become the acceptance threshold for a different facility.

Define what the operator delivers

Before requesting equipment, document the boundary between the operator’s delivered infrastructure and the customer’s installation. Ask the responsible project team to complete these fields:

Decision Evidence to request
Facility and phase Named address, building and deployment phase
Electrical service Documented connection arrangement and service milestones
Included equipment Equipment schedule showing retained, supplied and customer-provided systems
Operating duty Required normal, maintenance and outage behavior
Acceptance Named approver, inspection scope and required site tests

Separate an initial deployment from later expansion. If the buyer’s capacity requirement changes, revise the equipment brief and its interfaces before comparing offers. Record unresolved items explicitly so suppliers do not price different assumptions.

Prepare a comparable equipment offer

SecondWatt procurement analysis. A supplier’s proposal should identify the exact manufacturer, model, configuration and included components. Request condition records, maintenance history, inspection access and the documents the receiving project requires.

Keep equipment availability, transport, installation and accepted operation as separate milestones. Ask who is responsible for preserving the asset before shipment and for resolving discrepancies found during inspection. A proposed delivery date should identify what is actually being delivered and which obligations remain outstanding.

For equipment owners and sourcing partners, prepare proof of authority to offer the asset alongside the technical records. An operator’s public expansion announcement is not evidence that its equipment is surplus or available for sale.

What this profile does not establish

This profile does not assign a global generator brand, fuel-cell arrangement, facility count or building capacity without a directly supporting source and matching definition.

Treat every facility as a separate research record. A company-level disclosure cannot establish the power rating, commissioning state or accepted equipment configuration of an individual address.

Continue to market and equipment research

Compare the Northern Virginia and Chicago market research, or return to the data center intelligence hub.

Use the equipment dossiers to prepare a requirement or offer. Request equipment or submit equipment, with identifying records shared through the private inquiry process. SecondWatt holds no inventory; an operator profile is not an equipment listing.

Research checked: October 9, 2026. The results above describe 2025.