São Paulo Data Center Market
Sao Paulo data center market: capacity, vacancy, Eletropaulo grid pricing, ONS interconnect timelines, and Brazilian hyperscale buildout pipeline.
Location: Latin America, Brazil.
Market Metrics
- Operational capacity: 280 MW
- Facilities tracked: 70
Tracked Facilities
- PIX Telium — São Paulo, SP (5 MW)
- Cirion Sao Paulo - SAO1 — Cotia (5 MW)
- PIX Samm Florida — São Paulo, SP (5 MW)
- Ananke — São Paulo, SP (5 MW)
- Equinix SP2 - São Paulo — Barueri, SP (5 MW)
- TIVIT Sao Paulo — São Paulo, SP (5 MW)
- PIX ALGAR-VRAO — São Paulo, SP (5 MW)
- Equinix SP1 - São Paulo — São Paulo, SP (5 MW)
- B-BRIX - SPO1 — Barueri, SP (5 MW)
- Nextel MSO SPO — São Paulo, SP (5 MW)
- Terra Network Brasil S.A - SAO-01 — São Paulo, SP (5 MW)
- Eletronet Sao Paulo — São Paulo, SP (5 MW)
- Ultranet SP1 — São Paulo, SP (5 MW)
- Smart Telecom Telecomunicações LTDA — São Paulo (5 MW)
- Equinix SP4 - São Paulo — Barueri, SP (5 MW)
Powering a Project in This Market
Where the interconnection queue sets the schedule, on-site generation is the alternative that can be delivered in months. The Power Intelligence Tool compares fuel cells, aeroderivative gas turbines, reciprocating gas engines, diesel generators, and solar plus storage on twenty-year cost and time to power. Equipment sits in the marketplace — gas turbines, generators, transformers, and switchgear — with four-tier price context in the Pricing Index and acquisition capital through equipment financing.
Sourcing
Market figures above are stored values from the SecondWatt data center dataset. Collection and refresh rules are documented on the methodology page. Other markets and operators are indexed in the data center library, and published analysis in articles and reports.