Paris Data Center Market and Power

Use Paris market research to distinguish historical market measures from the power and equipment requirements of a particular project. The observations below use CBRE’s Paris market coverage; they are not totals for France.

Historical market snapshot

CBRE reported these observations for Q1 2026. The date 2026-03-31 labels the quarter end; it is not a separately reported daily measurement.

Observation Reported value Reporting period
Historical market inventory 666.8 MW Q1 2026; As of 2026-03-31
Historical overall market vacancy 6.7% Q1 2026; As of 2026-03-31

Procurement questions for an existing or expanding site

SecondWatt procurement analysis. Establish whether a requirement concerns a specific existing building, an extension to a campus or a proposed new site. Keep the equipment scope and delivery assumptions attached to that phase.

For an existing property, request the electrical interface requirements, retained equipment information and the owner’s acceptance criteria. If the project changes the permitted use or intended operating duty, ask the project team to identify the conditions the equipment package must meet before seeking a model match.

For an expansion, distinguish the operator’s commercial plan from documented electrical service and installation milestones. Ask which parts of the package can be inspected and accepted before delivery and which must be demonstrated after installation.

A national infrastructure announcement should enter the Paris project record only when its location, phase and relevance are established. Do not attach a France-wide power or investment total to the Paris market because the project has a French counterparty.

Continue to model research

Start with the equipment model dossiers. Identify the model, required configuration, condition and supporting documentation before submitting a sourcing request. A reference to a data center or operator does not establish that its equipment is for sale.

The figures on this page describe the publisher’s stated market and reporting period. They are not measurements of SecondWatt’s facility records, an offer of capacity, or confirmation of electrical service at a particular address. No market-wide electricity price or connection wait is published in this snapshot.

Return to the data center intelligence hub.

Research checked: 2026-09-29. Reporting dates are stated with each observation.